Lead Project Scheduler (f/m/d)

役割について

勤務地
ドイツ
Berlin
Berlin

  • 国: ドイツ
  • 州/県/国: Bayern
  • 市: Erlangen

在宅勤務 又は 事務所勤務
ハイブリッド勤務(在宅勤務/事務所勤務)
会社
Siemens Energy Global GmbH & Co. KG
組織
Grid Technologies
部署
Grid Solutions
フルタイム/パートタイム
フルタイム
経験レベル
熟練者 上級
A Snapshot of Your Day 

In the area of project scheduling at Siemens Energy Transmission, there is basically no 
day that is the same as the next. Considering your duties as an integral part of the 
project management team, you will face new challenges every day across all project 
phases.

Regardless of whether you find your use in an offer project or in the execution of future-
oriented electricity transmission projects, you are an active part of the energy transition. 
You are part of a sustainable power supply strategy, which is to be further implemented
in the coming years with many projects. 

As part of your tasks, you will help to plan and implement the project’s goals in 
teamwork and with foresight, to give the project a compass to solve any challenges that 
may arise in the best possible way. As part of your work, you help design the 
prerequisites to secure the energy supply of the future.


How You’ll Make an Impact 
  • Perform scheduling during the bid or settlement phase for complex turnkey power transmission projects
  • Create, customize, and update a settlement schedule with over 4000 activities using Primavera P6
  • Plan and coordinate contract schedules with project management, engineering, construction management, and subcontractors throughout execution
  • Regularly update the schedule, considering project management methods and reporting, including critical path analysis, milestone trend analysis, and earned value management
  • Detect deviations through analysis and develop appropriate countermeasures
  • Ensure schedule adherence by conducting deviation analysis and implementing corrective actions
What You Bring
  • Technical degree or training with extensive professional experience in engineering, manufacturing, installation, and commissioning interfaces
  • Expert in scheduling, resource and project planning, controlling, critical path analysis, and network engineering
  • Proficient in PRIMAVERA Enterprise, P6 / MS Project
  • Excellent language skills in German and English with intercultural competence
  • Experience in EPC projects, ideally in power transmission
  • Practical experience from construction site assignments
About the Team

Our Grid Technology division enables a reliable, sustainable, and digital grid. The power grid is the backbone of the energy transition. Siemens Energy offers a leading portfolio and solutions in HVDC transmission, grid stabilization and storage, high voltage switchgears and transformers, and digital grid technology.


Who is Siemens Energy? 

At Siemens Energy, we are more than just an energy technology company. With ~100.000 dedicated employees in more than 90 countries, we develop the energy systems of the future, ensuring that the growing energy demand of the global community is met reliably and sustainably. The technologies created in our research departments and factories drive the energy transition and provide the base for one sixth of the world's electricity generation.

Our global team is committed to making sustainable, reliable, and affordable energy a reality by pushing the boundaries of what is possible. We uphold a 150-year legacy of innovation that encourages our search for people who will support our focus on decarbonization, new technologies, and energy transformation.      


Find out how you can make a difference at Siemens Energy: https://www.siemens-energy.com/employeevideo

Our Commitment to Diversity 

Lucky for us, we are not all the same. Through diversity we generate power. We run on inclusion and our combined creative energy is fueled by over 130 nationalities. Siemens Energy celebrates character – no matter what ethnic background, gender, age, religion, identity, or disability. We energize society, all of society, and we do not discriminate based on our differences. 


Rewards/Benefits 
  • In addition to an attractive remuneration package in line with the market, you can expect an attractive employer-financed company pension scheme
  • We also offer the opportunity to become a Siemens Energy shareholder
  • We offer our employees the opportunity to work flexibly and remotely, and our inspiring offices provide space for collaboration and creativity
  • The professional and personal development of our employees is very important to us. We provide them with the opportunities to learn and develop in a self-determined way, various attractive programmes and learning materials are available for this purpose
  • In relation to the "compatibility of family and work", we have a wide range of offers, e.g. flexible working time models, childcare places at many locations, the possibility of trial part-time work or even a sabbatical
We value equal opportunities and welcome applications from people with disabilities.

https://jobs.siemens-energy.com/jobs

#RPO